Friends' Central Center for Innovation + Design
Client: Friends' Central School
Size: 9,340 s.f.
Conversion of a gymnasium built in 1920 into a fabrication and Innovation Center for the campus. CICADA is inserting a partial second floor into the existing two-story gymnasium, with a wood and metal working studio on the first floor and a Maker Space on the second floor.